Network overviewAugust 2026
Updating…
Leads this month
1,248+15% vs previous month
Test rides scheduled
11.9%148 leads
Test rides taken
6.9%86 leads
Interested prospects
27.4%342 leads
RNR rate
13.9%0: 48 · 1: 79 · 2+: 47 logged
Attention concentration
15.4%Bhawani Realtech · 34 leads
Feedback coverage85.3%184 missing
Follow-up coverage89.4%132 missing
Needs attention17.7%221 leads

Monthly performance

Lead volume and test rides

Lead volume

11.9% test rides scheduled · 6.9% taken in the selected month.

Pipeline

Lead stage mix

1,248

Follow-up history

Last recorded activity

0–2 days524
3–7 days337
8–14 days187
15+ days75
No date125

Based on the latest recorded follow-up date.

Priority worklist

Needs attention now

1–5 of 5
LeadDealerStageContact trailLatest feedbackLast follow-upStatus
KM
Kabir Malhotra•••• 2194
Bhawani RealtechDelhiNew
0 logged attempts

No attempt is logged in the dealer sheet.

Last contacted: timestamp not tracked · By: user not tracked

No feedback recordedNo follow-up dateFeedback + follow-up
NK
Neha Kapoor•••• 7921
Falcon JayanagarBangaloreContacted
1 logged attempt

From the dealer sheet’s numbered feedback entries.

#1Interested in weekend test ridecall · 26 Aug 2026

Last contacted: timestamp not tracked · By: user not tracked

Interested in weekend test ride26 Aug 2026 · 0d agoReview
AB
Arjun Batra•••• 9274
Long MilesPuneFollow up
1 logged attempt

From the dealer sheet’s numbered feedback entries.

#1Quotation shared; awaiting responseChannel not tracked · 17 Aug 2026

Last contacted: timestamp not tracked · By: user not tracked

Quotation shared; awaiting response17 Aug 2026 · 9d agoReview
AR
Aisha Rao•••• 4812
Falcon JayanagarBangaloreTest Ride Scheduled
1 logged attempt

From the dealer sheet’s numbered feedback entries.

#1Confirmed for SaturdayChannel not tracked · 25 Aug 2026

Last contacted: timestamp not tracked · By: user not tracked

Confirmed for Saturday25 Aug 2026 · 1d agoReview
KM
Karthik Menon•••• 3047
Pitampura - Mehar MotorDelhiRNR
0 logged attempts

Attempt indicated by lead stage; no contact entry was logged.

Last contacted: timestamp not tracked · By: user not tracked

No feedback recordedNo follow-up dateFeedback + follow-up

Dealer performance

Network comparison

Percentages make differently sized dealerships easier to compare.

DealerLeadsTest rides scheduledTest rides takenInterestedFollow-upNeeds actionData score · 6 months
Bhawani RealtechDelhi18411.4%21 scheduled6%11 taken26.6%49 leads72%52 missing34
70
Open
Long MilesPune14612.3%18 scheduled6.8%10 taken28.8%42 leads79%31 missing26
77
Open
Corsa PallavaramChennai13812.3%17 scheduled7.2%10 taken31.9%44 leads85%21 missing18
84
Open
Keasha MotoworldGurugram15412.3%19 scheduled8.4%13 taken31.2%48 leads90%15 missing14
89
Open
Falcon JayanagarBangalore20613.1%27 scheduled8.7%18 taken33%68 leads94%12 missing11
93
Open